Skip to main content

Project types and contact processes

Projects provides two reusable process tools with different jobs:

  • A Project Type standardizes how the whole project runs.
  • A Contact Process collects information, checklist completion, or approvals once for each contact attached to a project.

Who can do this​

Owners and Admins, and users granted Projects → Manage Project Types, can manage project types. Access to contact processes also depends on the relevant contact and workspace permissions.

Choose the right process​

RequirementUse
Repeat the same delivery phases and responsibilities for each projectProject Type
Enforce an ordered set of project stepsProject Type
Collect answers or approvals separately for each linked contactContact Process
Start a one-off project with no reusable processNo project type in the creation wizard

Work with Project Types​

Open Projects → Project Types. The list shows the type, category, status, version, last update, and actions.

A type can be a Draft while it is being designed and Published when it is ready for the project creation wizard. Published types can be duplicated for a variation or deprecated when they should no longer be used for new work.

Build a type​

  1. Select New type, or start from Industry packs when a suitable pack is available.
  2. Add one or more Stages.
  3. Add the steps that belong to each stage.
  4. For each step, define its name, instructions, assignment, and due timing.
  5. Assign work through a Project role when the same responsibility should be filled by different people on different projects.
  6. Mark a step Required to continue when later work must remain locked until it is complete.
  7. Use Preview to review the sequence.
  8. Save draft while designing; select Publish only when the process is ready to create live projects.

Due timing can be relative to the previous step. A required step acts as a completion gate, while a non-required step can allow the process to continue.

What publishing changes​

Only a published type is offered in Step 2 of project creation. When selected, the project copies the type's stages, steps, board, and tabs. The type is therefore a starting blueprint; the resulting project is the team's live delivery workspace.

Work with Contact Processes​

Open Projects → Contact Process. A Contact Process is filled once for each contact on any project to which it is attached.

  1. Select New process.
  2. Start a blank process, or choose a reusable template when one exists.
  3. Build the forms, checklists, and approvals required from or about each contact.
  4. Publish the process when it is ready to be reused.

This is useful when every linked participant must provide their own response. It is not a replacement for project stages: stages move the overall project forward, while a Contact Process tracks a separate completion for each contact.

Verify your work​

  • A Project Type remains Draft until it is deliberately published.
  • The published type appears in the project creation wizard.
  • A project created from the type contains the expected Stages and tabs.
  • Project-role assignments are filled by the correct people on the live project.
  • Required steps prevent later steps from unlocking until completion.
  • A Contact Process produces a separate completion path for each linked contact.

Troubleshooting​

IssueWhat to check
The type is missing during project creationConfirm its status is Published, not Draft or deprecated.
A step has no owner in a live projectConfirm the referenced Project role is assigned on that project.
Later steps are available too earlyEnable Required to continue on the gating step.
Contact Process list is emptyNo process has been created or published yet; start a blank process.
Users confuse milestones with stagesMilestones organize delivery work; Stages execute the reusable Project Type process.

See also​